Operational Guide for National Tuberculosis Control Programmes on the Introduction and Use of Fixed-Dose Combination Drugs
(2002; 81 pages) View the PDF document
Table of Contents
View the documentACKNOWLEDGEMENTS
View the documentLIST OF ACRONYMS AND ABBREVIATIONS
View the documentPREFACE
View the documentKEY POINTS
Open this folder and view contents1. INTRODUCTION
Open this folder and view contents2. PROGRAMMATIC AND MANAGERIAL REQUIREMENTS FOR FDCS
Open this folder and view contents3. FDC DRUG MANAGEMENT
Close this folder4. ENSURING THE QUALITY OF FDC DRUGS
Close this folder4.1 Building a quality assurance system for the national TB programme
View the document4.1.1 Quality assurance where there is an operational drug regulatory authority
View the document4.1.2 Quality assurance where there is no national drug regulatory authority or no operational drug registration system
View the document4.2 Bio-availability and bio-equivalence (interchangeability) data
View the document4.3 Laboratory testing
View the document4.4 The WHO Certification Scheme
View the document4.5 Facilitating the drug registration process
Open this folder and view contents5. HOW TO INTRODUCE AND CHANGE OVER TO A REGIMEN WITH 4-DRUG FDCS/2-DRUG FDCS: PLANNING AND IMPLEMENTING A "SCENARIO"
View the documentAnnex 1. Glossary and use of terms
View the documentAnnex 2. WHO Certification Scheme - Model Certificate of a Pharmaceutical Product1
View the documentAnnex 3. WHO Certification Scheme - Model Batch Certificate of a Pharmaceutical Product
View the documentAnnex 4. Example of an order form for anti-TB drugs for treatment facilities
View the documentAnnex 5. Steps in the quantification of anti-TB drugs using consumption-based information
View the documentAnnex 6. Suggested reading
View the documentRequest for feedback on the guide
 

4.1 Building a quality assurance system for the national TB programme

Generally, the complexity of the QA system to be developed and implemented will depend on whether a DRA exists and functions, and whether drug registration and inspection activities are operational and reliable or not.

to previous section to next section
 

Last updated: May 3, 2013